Project Details
Introduction
At Hin Chong, we pride ourselves on delivering exceptional lift modernisation solutions tailored to meet the unique needs of our clients. One of our recent projects involved a full lift replacement for a 35-year-old apartment building in Geylang, Singapore. This project exemplified our expertise, dedication, and ability to deliver high-quality results within stringent timelines and budgets.
The Challenge
Problem
The 35-year-old Geylang apartment building had been serviced by the same lift company since its construction. However, the aging lift system faced numerous issues:
- Frequent and disruptive breakdowns due to obsolete and irreparable components.
- Frustrated tenants and owners due to unreliable lift service.
- The incumbent contractor’s recommendation to replace the entire lift system was beyond the estate’s budget.
Given the limited funds and a critical need to minimize downtime (as the building had only one lift), the Management Corporation Strata Title (MCST) sought alternative solutions through a broader market search. This search led them to Hin Chong via our website contact form.
Solution
We responded promptly by conducting a comprehensive lift health assessment and presenting a proposal for a full lift replacement. Our proposal highlighted:
- A competitive pricing structure that met the estate’s budget.
- A commitment to complete the project within six weeks.
- Proven expertise and professionalism demonstrated during interviews with the MCST’s managing agent (MA) and council members.
Our ability to address the MCST’s concerns, particularly the need for a rapid and efficient replacement, ultimately secured us the project.
Key Results and Outcomes
The project’s main objectives included dismantling the old lift, installing a new one, and extending the lift’s lifespan by at least 20 years while enhancing reliability and reducing long-term costs. Key outcomes were:
- Reliability Improvements:
The new lift significantly reduced breakdown frequency, providing tenants with reliable service.
- Cost Efficiency:
The modern lift system brought long-term savings through decreased maintenance and repair needs.
- Enhanced Property Value:
The upgraded lift increased the property’s appeal and value, attracting potential tenants and buyers.
- Timely Delivery:
Despite unforeseen challenges, we completed the project one week ahead of the six-week deadline, demonstrating exceptional project management and operational efficiency.
The full replacement encompassed:
- Electrical and electronic components, including controllers, drives, buttons, and indicators.
- Mechanical systems, such as the main motor, wire ropes, and overspeed governor.
- Internal lift structures, including the car body, guide rails, counterweights, and buffers.
To achieve this, we:
- Assigned a dedicated project team led by an experienced site manager.
- Conducted weekly status meetings and daily on-site updates to proactively address potential issues.
- Maintained close collaboration with the MCST and stakeholders throughout the project.
The MCST and MA were delighted with our work, as reflected in their glowing 5-star Google review.
Conclusion
We successfully transformed a critical challenge into an opportunity to showcase our expertise in lift modernisation. By delivering a high-quality lift replacement ahead of schedule and within budget, we improved tenant satisfaction, reduced operational disruptions, and enhanced the property’s overall value.
As the MCST noted in their testimonial:
"They completed the entire lift replacement at record speed using 6 weeks only. The job they did is very high quality too. Extremely happy and satisfied with Mr. Adrian from Hin Chong who take care of this entire project. Well done and thank you Adrian!"
This project exemplifies our commitment to excellence and our ability to exceed client expectations, even under challenging circumstances.