When it comes to lift modernisation, there’s no one-size-fits-all solution. Every building in Singapore has unique needs based on its age, design, and usage patterns. That’s where Hin Chong excels—providing tailored lift modernisation solutions that address specific challenges, while improving safety and performance.
In this article, we’ll share real-life case studies from our portfolio. We hope that this will give you a better idea of how lift modernisation can be tailored to meet your specific needs.
Why Tailored Lift Modernisation Matters
No two buildings are the same, and a tailored lift modernisation plan considers the building’s specific structure, the current condition of the lift system, and the actual needs of tenants or residents.
Lift modernisation may encompass the upgrading of the Lift Control System, which includes components such as control panels, buttons, displays, emergency backup systems, and sensors. It could also extend to the Lift Mechanical System, addressing essential elements like the main motor, wire ropes, and safety mechanisms designed for free-fall detection.
Besides this, tailored timelines and work arrangements are often required to reduce inconvenience and disruption. For example, a lift modernisation project in a building with just a single lift would differ from one where modernisation must be conducted in phases to ensure continuous lift operation.
This flexibility in planning and execution ensures that lift modernisation projects are seamlessly integrated into the daily operations of the building, paving the way for a smoother transition to the next phase of upgrades.
Below are some real examples of Hin Chong's own case studies:
1. Upgrading a Lift Driving System for a Construction SME
A local small and medium-sized enterprise (SME) in the construction industry faced frequent lift breakdowns due to an aging drive system. Issues included oil leakage, jerky lift movements, uneven floor leveling, and even cases of mantrap as a result of the motor overheating.
Our solution was to upgrade the lift driving system, significantly improving its reliability and reducing operational disruptions. The result? A more efficient lift system that better supports the company’s daily operations.
Read the full case study here.
2. Conversion of a Hydraulic Lift to a Traction Motor Room-Less Lift
An old hydraulic lift in a conservation shophouse building experienced recurring lift breakdowns. Its poor service reliability, combined with outdated appearance, led to decreased tenant satisfaction, with some tenants considering lease termination.
We upgraded the outdated lift system to a traction motor-room-less (MRL) lift, enhancing reliability and aesthetics while providing the property owner with an option to increase rental rates during tenant renewals.
Read the full case study here.
3. Modernising the Lift Control System for a Membrane Filtration Company
The lift control system in an industrial facility experienced frequent lift breakdowns and significant damage, as it had exceeded 20 years of operation. With components becoming obsolete and increasingly difficult to source, each malfunction resulted in extended downtime. Eventually, a critical fault occurred, causing a short circuit in both the lift motherboard and drive system.
To address these issues, we replaced the outdated control system with a modern, technologically advanced solution. This upgrade ensured long-term reliability and reduced lift maintenance expenses, while providing an enhanced user experience.
Read the full case study here.
4. Full Modernisation of a Passenger Lift for a Global MNC
A multinational corporation approached us to modernise a second passenger lift in one of their high-traffic commercial buildings.
The challenges identified included:
Aging lift components which compromised reliability and functionality
The need for enhanced safety, comfort, and operational efficiency
Prolonging the operational lifespan of the lift system
With a solid track record from our previous lift modernisation project with the client, we were entrusted to undertake this project in a single, efficient phase. This streamlined process allowed us to complete the work within four weeks, notably shorter than the six weeks required for the earlier two-phase approach.
Read the full case study here.
5. Full Lift Replacement for a Geylang Apartment Building
In Geylang, an ageing residential building was struggling with frequent lift breakdowns and long downtimes due to obsolete lift components.
The existing lift contractor's proposal to replace the entire lift system exceeded the estate's allocated budget. With limited financial resources and a pressing requirement to reduce downtime—given that the building operated with a single lift—the Management Corporation Strata Title (MCST) faced significant challenges.
Our solution provided the MCST with a cost-effective pricing plan aligned with their budget, enabling the successful implementation of a complete lift replacement.
Read the full case study here.
Work with a BCA-registered Lift Contractor for Lift Modernisation
At Hin Chong, we're committed to delivering tailored lift modernisation solutions for all types of buildings in Singapore. Whether it’s a residential apartment, a commercial office, or an industrial facility, our expertise ensures:
Full compliance with Building and Construction Authority (BCA) regulations
Cost-effective solutions
Minimal disruption during the lift modernisation process.
Enhanced safety, reliability, and user satisfaction