Hin Chong Logo
Lift Modernisation

Lift Driving System Modernisation for a Service Lift - Local SME Construction Company

Project completed: Nov 2024
We modernised a 23-year-old service lift for a local SME, resolving breakdowns, jerking, and overheating issues. By installing a modern driving system, we improved reliability, ride comfort, and user satisfaction while reducing costs. Completed in two weeks, the project earned a 5-star review, reflecting our commitment to excellence.

Key Project Outcomes:

  • Replaced the outdated lift system with a modern solution
  • Improved reliability and user ride comfort
  • Achieved long-term cost savings for the client
Lift Driving System Modernisation for a Service Lift - Local SME Construction Company

Project Summary

We pride ourselves in completing our projects within the agreed timeframe with maximum customer satisfaction.

2 weeks

Project duration

1

Lifts modernised

5 years

Extended warranty

★★★★★

Google review

Photo Gallery

A visual showcase of what we've done for this project.

AFTER project completion
BEFORE work commencement

Project Details

Introduction

At Hin Chong, we pride ourselves on delivering innovative and cost-effective lift modernisation solutions. Recently, we partnered with a local SME construction company to modernise the driving system of their aging service lift. This project not only refreshed the existing system but also significantly enhanced lift reliability, ride comfort, and long-term operational savings.

The Challenge

Problem

The service lift's driving system, over 23 years old, had become increasingly problematic. Frequent issues included:

  • Rapidly wearing mechanical components.
  • Oil leakage from the main motor.
  • Erratic lift travel movements leading to severe jerking and uneven levelling.
  • Passengers occasionally being stuck due to motor overheating.

Repairing the old components proved costly and unsustainable due to their short-lived durability. It was evident that modernising the system would be more practical, cost-effective, and beneficial in the long term.

Solution

We proposed a complete Lift Driving System Modernisation, with clear benefits for the client:

  1. Replacement of the outdated system with a modern, technologically advanced solution.
  2. Resolution of frequent breakdowns and improvement of reliability.
  3. Enhanced user experience through smoother and more comfortable lift operations.
  4. Substantial cost savings by eliminating repeated repairs and replacements.

The client readily agreed, recognizing the long-term value of our solution.

Key Results and Outcomes

  • The aging lift driving system was successfully replaced with a modern, advanced system.
  • Frequent breakdowns were eliminated, resulting in improved operational reliability.
  • Lift users now experience smoother rides, enhanced comfort, and increased satisfaction.
  • The modernisation project achieved long-term cost savings, reducing repair and replacement expenses.

We adhered to our commitment and completed the project within the promised two-week timeline, from October 25th to November 8th, 2024.

The client expressed their delight and left us a glowing 5-star Google review, a testament to their satisfaction with our work.

Conclusion

This project underscores the importance of investing in modernisation for aging lift systems. By partnering with Hin Chong, the client achieved a seamless transition to a reliable, cost-effective, and technologically advanced lift driving system.

Our dedicated team’s expertise ensured timely completion, and the positive customer feedback reaffirmed our commitment to excellence in lift modernisation services. We look forward to continuing to deliver outstanding solutions tailored to our clients' unique needs.

View more projects

We're specialists when it comes to keeping lifts in their optimal condition. Check out some of our recent projects.

Full Lift Replacement for a 35-year-old Geylang Apartment Building
Lift Modernisation

Completed Dec 2024

Full Lift Replacement for a 35-year-old Geylang Apartment Building
Full Modernisation of Passenger Lift No. 2 for a Global MNC in Singapore
Lift Modernisation

Completed Jul 2024

Full Modernisation of Passenger Lift No. 2 for a Global MNC in Singapore
Modernisation of the Lift Control System of a Passenger Lift for a Singapore-based Membrane Filtration Technology Company
Lift Modernisation

Completed Apr 2024

Modernisation of the Lift Control System of a Passenger Lift for a Singapore-based Membrane Filtration Technology Company

Work with Singapore's leading lift maintenance company

We'll ensure that your lifts are always functioning optimally.